EUROPEAN VLBI NETWORK CALL FOR PROPOSALS

The European VLBI Network (EVN) invites observing proposals for the 1 June 2002 deadline.
See below for further details and instructions on how to submit proposals

Introduction

The EVN consists of a VLBI network of radio telescopes in Europe and Asia operated by an international Consortium of institutes.

Consult the EVN User Guide for the following:

The EVN encourages use of the Network by astronomers not specialised in the VLBI technique. The Joint Institute for VLBI in Europe (JIVE) can provide support for schedule making, correlation and data analysis of EVN projects, as well as advice during proposal preparation. Contact Michael Garrett (garrett@jive.nl) for information about The JIVE EVN Support Group

In particular, the EVN is in receipt of an award from the European Commission's Access to Research Infrastructures Programme (an action of the Improving Human Potential Programme) that supports EVN projects led by non-EVN institute PIs affiliated to EU and Associated State Institutes. As well as providing access to the EVN, the programme provides financial support for visits to the EVN observatories and JIVE. Contact Michael Garrett (garrett@jive.nl) for information or see the EC ARI Page at JIVE.

EVN Observing Sessions in 2002/3

2002 Session 3 Nov 07 - Nov 28 18/21cm (with Jb-1 & Cm), 6cm+MERLIN, 1.3cm + MERLIN
2003 Session 1 Feb 06 - Feb 27 18/21cm + MERLIN, 5cm, 6cm? +...
2003 Session 2 May 22 - Jun 12 6cm, 18/21cm +...
2003 Session 3 Nov 06 - Nov 27 Frequencies to be determined

Proposals received by 1 June 2002 will be considered for scheduling in Session 3, 2002 or later. Finalisation of the planned observing wavelengths will depend on proposal pressure. Projects will only be scheduled during sessions.

Special features for Sessions in 2002/3

Combining EVN antennas with other arrays

Proposers may request EVN antennas together with other telescopes and arrays.

EVN + MERLIN Observations

MERLIN is an radio-linked array of 6 telescopes in England with a maximum baseline of 217 km. Combined EVN+MERLIN projects add the short MERLIN baselines (10 - 217 km), which will help to image more extended sources, as well as providing VLBI baselines to the CAMBRIDGE antenna. Most EVN sessions usually include some combined MERLIN + EVN observations at 18 or 6cm. MERLIN + EVN time will be allocated by the EVN PC, but the case for joint observations must be made in the proposal.

Including other antennas

Antennas of the NASA DSN, including the 70-m at Robledo, and the 300-m Arecibo antenna may be available for a small number of projects requiring very high sensitivity. The 25-m antenna at Hartebeesthoek, South Africa, provides useful N-S resolution for low-declination sources.

Global VLBI

GLOBAL projects add the NRAO VLBA and/or other US antennas, creating an array of up to 20 elements, suitable for very high dynamic range imaging, and "snap-shot" observations of many sources.

Submitting EVN Proposals

Deadlines

Proposals must be received by 1st Feb, June or Oct.

Contact

Before submission the PI should ensure that all named co-proposers have given their consent to be included in the list of investigators. All communication between the Proposer(s), and the EVN Program Committee or Scheduler will be via the Contact Author designated in the proposal.

How to submit

Rules for email submission

Proposals may be submitted as postscript files by email via the addresses above, following the following guidelines. See also the NRAO guidelines on submitting proposals

After submission

A list of all proposals received will be posted shortly after the deadline. All communication between the Proposer(s), and the EVN Program Committee or Scheduler will be via the Contact Author designated in the proposal. The results from proposal review will be communicated after the next meeting of the EVN Program Committee, and will be SENT BY EMAIL unless otherwise requested in the proposal Abstract.

Guidelines on what to include in proposals

All proposals should include the VLBI proposal cover sheet (see below) and a text NOT EXCEEDING 2 SIDES. This should contain both a scientific and a technical justification for the resources requested. It should include a brief summary of any related EVN proposals which have already been observed or scheduled. Proposers should indicate if it is a resubmission of an earlier proposal. Up to 2 additional sides with diagrams may be included; the total, including cover sheet, should not exceed 6 sides.

Phase-referencing observations

Observers are advised to find phase calibrators as close as possible to their target source and warned that at 18cm phase calibration is affected by the ionosphere which is still active after the recent solar maximum. The VLBA Calibrator Survey , which now has updated source positions from VLBA 'geodetic observations', may be useful here. For proposals where phase-referencing is essential, the calibrator source(s) should be specified.

Previous EVN Observations

Lists of previous observations have been compiled by Tiziana Venturi.

The VLBI Proposal Coversheet

The VLBI Proposal Coversheet must be used for all proposals.

The up-to-date version should be obtained via JIVE

Correlation of EVN observations

Correlation of EVN projects at JIVE

The capacity of the EVN MkIV Data Processor at JIVE has been increased recently and its main limitation is in terms of data transfer. The minimum integration time for read-out of the entire correlator is 4s (2s has been recently tested). The maximum number od spectral points per baseline when using the entire correlator is 512 for 16 telescopes or 2048 for 8 telescopes. These spectral channels can be spread arbitrarily over sub-band/polarization with a minimum of 16 spectral points per individual product. All EVN proposals are subject to a technical assessment by correlator staff, and any technical difficulties of correlation are discussed during EVN proposal review. See the update on the JIVE correlator capabilities or or email Huib van Langevelde (langevelde@jive.nl) for questions.

Correlation of EVN projects at Bonn

Limited time may be available for the correlation of EVN experiments at the Bonn Mk4 VLBI Correlator , but only by PRIOR arrangement with the MPIfR correlator staff. Suitable projects will be those for which the scientific advantage of using the MPIfR Correlator is given in the proposal, or those which include an MPIfR collaborator who wishes to have closer "hands-on" approach to the data flow. For details contact the Correlator Manager, Walter Alef, walef@mpifr-bonn.mpg.de or see the Bonn Mk4 Correlator Status Page .

Correlation of EVN projects in Socorro

For experiments which cannot yet be correlated at JIVE, the VLBA correlator in Socorro may be available for a limited number of "EVN-only" experiments. Proposers should submit such proposals to NRAO and the EVN. See the VLBA Observational Status Summary for correlator capabilities.

Correlation of Global VLBI Projects

Proposers of GLOBAL projects must use VLBA/MKIV-compatible recording modes. Either the VLBA correlator or the EVN correlator at JIVE may be explicitly requested for technical reasons, in which case the PI should make a case for the choice of correlator. The EVN Program Committee and the NRAO and EVN Schedulers will consider the correlator requested for each proposal submitted and assign one if no preference was given, also taking into account the load on the correlators, the logitisics of tape distribution and the proximity of the PI to the correlator.

Short Observations

"Short" observations (< 4 hours) may be proposed up to 6 weeks before an observing session begins, by means of a brief justification to the Chairman of the EVN PC, who will, at his discretion, authorise scheduling in any gaps in the session plan. They are intended to allow the EVN to respond to urgent "targets of opportunity", or to facilitate short, pilot observations, if needed in preparation for a full proposal. They can only be granted limited resources (number of telescopes, tapes, correlator time) and must use standard recording modes. They should not involve any special observing set-ups. The present EVNPC Chairman is: Simon Garrington, Jodrell Bank Observatory, Macclesfield SK11 9DL, UK. Tel +44 (0)1477 571321 Fax +44 (0)1477 571618 Email: stg@jb.man.ac.uk

Large projects

Most proposals request 12-48hrs onserving time. The EVN PC also encourages larger projects (>48 hrs) but these may be subject to more detailed scrutiny, and the EVN PC may, in some cases, attach conditions on the release of the data.

Access to Proposal Information

Note that the following data from the proposal will be stored in machine- readable form: PI name and email, wavelength, observing mode, program title, requested telescopes, EVNPC rating. The data will be distributed to the EVN Scheduler, VLBA scheduler. For proposals supported under the IHP program "Access to Research Infrastructures", the title, author list, and amount of time granted (or a brief reason for rejection) will be made available to the EC in Brussels. Copies of all EVN+MERLIN proposals will be made available to the MERLIN TAC Chairman, together with the EVNPC rating. Coversheets of proposals requesting use of the VLBA correlator will be forwarded to NRAO for checking technical feasibility. Copies of proposals requesting ARECIBO will be forwarded to the Arecibo Observatory for technical review.

Further Information

Informal enquiries about technical feasibility of EVN or EVN+MERLIN projects may be directed to Michael Garrett (JIVE EVN Support Group, garrett@jive.nl)

Future EVN Calls for Proposals and other VLBI news can be received from the VLBI e-mail exploder. To subscribe, send the message "subscribe vlbi" in the body (not the subject line) of an e-mail to: Majordomo@zia.aoc.nrao.edu