JODRELL BANK TELESCOPE STATUS
| Mark II 28x25 m TelescopeLast updated automatically at 23:25:10 09/02/2010
|
| Control | RA | Dec | Epoch | Source | RXC A B |
| MERLIN | 05:52:01 | 39:48:21 | B1950 | 0552+398 | 5168 0 |
| Position | Receiver | 1 | ||||||
| Azimuth | Elevation | LO1 (MHz) | 434.0 | |||||
| Motors | On | On | LO2 (MHz) | 120.0 | ||||
| Actual | 259.75 | 59.97 | LO3 (MHz) | 38.0 | ||||
| Demanded | 259.75 | 59.97 | VLBI box | |||||
| Error | 0.000 | 0.000 | Phase cal | |||||
| Offset | 0.004 | -0.010 | Cryo P | 0.0A 0.0B | ||||
| Cryo T | 1.0A 21.0B 15.8C 1.0D |
|||||||
| No Errors | ||||||||
This information is for the use of Jodrell Bank Observatory staff in our astronomy and engineering applications. We cannot guarantee the accuracy of the data or fitness for use for any other purposes.

